EXAMINATION OF THE LONG-TERM EFFECTS CLOSE PARALLEL CONSTRUCTION OF SHIELD TUNNELS ON THE SECTIONAL FORCE OF SEGMENT EMERGING IN THE TUNNEL EARLIEST BOREDYoshiji Matsumoto, Hiroki Kobayashi, Yukinori Koyama et al.|PROCEEDINGS OF TUNNEL ENGINEERING, JSCE|1994Cited by 0
A Study on Temporary Column Removal in Triple-face ShieldYoshiji Matsumoto, Yukihiko Baba, Yukinori Koyama et al.|PROCEEDINGS OF TUNNEL ENGINEERING, JSCE|1994Cited by 0
STUDY ON THE DESIGN METHOD OF SHIELD DRIVEN TUNNEL LINING BASED ON FIELD MESUREMENTSYoshiji Matsumoto, Hiroki Kobayashi, Yukinori Koyama et al.|PROCEEDINGS OF TUNNEL ENGINEERING, JSCE|1993Cited by 0