De-Risking the First Multivendor HVdc Project using Real-Time Hardware-in-the-Loop Simulation: Electromagnetic Transient and Real-Time Simulations are Crucial
S. Dennetière(Électricité de France (France)), Pehr Hjalmarsson(Hitachi (Sweden)), Kamran Sharifabadi(Equinor (Norway)), Pierre Rault, Torsten Priebe(Siemens (Germany)), Nemanja Krajisnik(Siemens (Germany))
Cited by 4
Related Papers
Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems
|Unknown|2016|674
Designing for High-Voltage dc Grid Protection: Fault Clearing Strategies and Protection Algorithms
|IEEE Power and Energy Magazine|2019|56
Voltage and Frequency Control in Offshore Wind Turbines Connected to Isolated Oil Platform Power Systems
|Energy Procedia|2012|44
Challenges with integration and operation of offshore oil & gas platforms connected to an offshore wind power plant
|Unknown|2014|28
Dynamics and Control
|Unknown|2016|22