A two-stage ant colony algorithm for hybrid flow shop scheduling with lot sizing and calendar constraints in printed circuit board assemblyWei Qin(Shanghai Jiao Tong University), Ou Tang(Linköping University)Computers & Industrial EngineeringOctober 8, 201910.1016/j.cie.2019.106115Cited by 72SaveCiteExport RISWatch citationsRelated PapersHydrogen production in the Swedish power sector: Considering operational volatilities and long-term uncertainties|Energy Policy|2020|19